GOGRATING - GRATING PANEL SCHEDULE Blank enquiry template | Version 2026-09-04 Source: https://gograting.com/design-specification/grating-rfq-checklist/ Use one PANEL RECORD per distinct panel type. Duplicate the blank record as needed. State units for every dimension. Write UNKNOWN for missing information; do not guess. This template collects information only. It is not a drawing, design approval, stock list, quotation, or guarantee of product availability. PROJECT RECORD Project reference: Site / destination: Application and exposure: Drawing reference and revision: Measurement units: Required documents and governing references: Requested delivery date: Packing / unloading constraints: Delivery point and commercial scope: Outstanding questions: PANEL RECORD - duplicate this section for each distinct panel type Panel mark / ID: Quantity: Product family and construction: Material grade or exact resin designation: Drawing reference and revision: Finished length (value and unit): Finished width (value and unit): Bearing direction shown on drawing: Clear span and support details (or drawing reference): Section / depth / mesh / spacing designation: Openings / cut-outs / edge treatment: Surface and coating requirements: Fixing / removability requirements: Load-case document reference: Exposure / chemical / temperature document reference: Required product data and inspection documents: Unknown items / deviations to review: Before sending: attach the referenced drawings, identify missing information, and remove confidential information that is not needed for this enquiry. The written quotation must confirm supply scope, documents, price and schedule.